TOOLS & PLANNERS
Infrastructure Project Planner
Plan and document a network or communications-room project in one browser workspace. Project data is stored locally in this browser when available. Export a JSON backup if the project matters.
PROJECT
Project Dashboard
REQUIREMENTS
Endpoint Inventory
Record the quantities that drive port, PoE and cabling requirements. Power values are values you enter from your design or verified device information.
| Type | Qty | Ports ea. | PoE W ea. | Total ports | Total PoE W | Notes |
|---|
LOGICAL NETWORK
VLAN & IP Plan
This records the design you enter. VLAN IDs and subnets are not assigned automatically.
| VLAN | Name | Subnet | Gateway | Notes |
|---|
SWITCHING
Switch & PoE Port Mapper
Map switch ports and compare entered PoE loads with an entered switch PoE budget. This does not determine switch compatibility or PoE negotiation.
PHYSICAL CABLING
Patch Panel & Cable Mapper
| ID | Origin | Destination | Type | Length | Switch port | Status |
|---|
RACK ELEVATION
Rack Planner
Use Up and Down to reorder the vertical plan. The planner checks U-space only, not depth, rails, weight, airflow, cable clearance or load rating.
POWER PATH
A/B Rack Power Mapping
Record entered equipment loads and their intended feed. A dual-cord device is only shown as dual-fed when you explicitly add both A and B entries.
| Equipment | Load W | Feed | PDU / outlet |
|---|
INSTALLATION
Commissioning Record
HANDOVER
Project Report
Generate a printable project summary from the data entered above.
The report documents entered information and arithmetic. It is not a certification of standards compliance, electrical design, structural suitability, RF coverage, cybersecurity or equipment compatibility.