Short field checklists designed to stop important evidence and verification steps disappearing at the end of a job.

Pre-installation

  • Approved scope/drawings available
  • Routes and access confirmed
  • Correct cable and hardware received
  • Environmental requirements checked
  • Test and labelling plan agreed

Copper

  • Manufacturer handling limits checked
  • Permanent links labelled
  • Terminations inspected
  • Correct test limit selected
  • Results saved against cable IDs

Fibre

  • Fibre/connector type confirmed
  • End faces inspected
  • Polarity documented
  • Reference/test method recorded
  • Loss/OTDR evidence retained as required

Rack

  • Depth/rails/load checked
  • Rack elevation updated
  • Patch leads managed
  • Power outlets mapped
  • Photographs taken

WiFi

  • AP locations documented
  • Cabling and PoE verified
  • RF validation performed against project criteria
  • Channels/widths recorded
  • Coverage issues recorded

Handover

  • As-built schedules delivered
  • Test reports delivered
  • Deviations listed
  • Configuration backup location recorded
  • Secrets excluded from general handover pack